Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jan 05, 2023     Left wing fuel float - (2 hours)       Category: Wings
Began assembly of left wing fuel float by,replacing stock fuel pick up with a screened version. Since my kit did not include the anti locking bracket, I drilled a hole in the tube nut and safety wired it to the bracket. Temporarily installed the fuel cover and adjusted the fuel pick up to avoid conflict with the fuel drain that I installed. Bent the float arm to recommended length and used a flashlight and mirror to view inside the fuel tank as you can see in the fuzzy picture. Assembled the fuel float using the plexiglass template I used on the right tank. It works great to adjust the range of the float via the access hole to the side.


 